Skip to content

Merge pull request #27 from eriknovak/tests #75

Merge pull request #27 from eriknovak/tests

Merge pull request #27 from eriknovak/tests #75

Triggered via push December 11, 2024 13:31
Status Success
Total duration 35m 9s
Artifacts

unittests.yaml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
test (ubuntu-latest, 3.11)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
test (ubuntu-latest, 3.11)
The operation was canceled.
test (ubuntu-latest, 3.9)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
test (ubuntu-latest, 3.9)
The operation was canceled.
test (ubuntu-latest, 3.10)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
test (ubuntu-latest, 3.10)
The operation was canceled.
test (ubuntu-latest, 3.12)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 30 minutes.
test (ubuntu-latest, 3.12)
Runner GitHub Actions 19 did not respond to a cancelation request with 00:05:00.