Skip to content

Prepare CI

Prepare CI #1

Triggered via push July 6, 2024 15:28
Status Failure
Total duration 27s
Billable time 3m
Artifacts

ci.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (1.20.x)
golangci-lint exit with code 3
build (1.21.x)
The job was canceled because "_1_20_x" failed.
build (1.21.x)
The operation was canceled.
build (1.22.x)
The job was canceled because "_1_20_x" failed.
build (1.22.x)
The operation was canceled.