Skip to content

Commit

Permalink
[8.15] fix(slo): Use correct calendar period (#199873) (#200067)
Browse files Browse the repository at this point in the history
# Backport

This will backport the following commits from `main` to `8.15`:
- [fix(slo): Use correct calendar period
(#199873)](#199873)

<!--- Backport version: 9.4.3 -->

### Questions ?
Please refer to the [Backport tool
documentation](https://github.com/sqren/backport)

<!--BACKPORT [{"author":{"name":"Kevin
Delemme","email":"[email protected]"},"sourceCommit":{"committedDate":"2024-11-13T18:39:45Z","message":"fix(slo):
Use correct calendar period
(#199873)","sha":"3cbdcc3609269dcf109fe787359b2504203da229","branchLabelMapping":{"^v9.0.0$":"main","^v8.17.0$":"8.x","^v(\\d+).(\\d+).\\d+$":"$1.$2"}},"sourcePullRequest":{"labels":["bug","release_note:fix","v9.0.0","backport:prev-major","ci:project-deploy-observability","Team:obs-ux-management","v8.17.0"],"title":"fix(slo):
Use correct calendar
period","number":199873,"url":"https://github.com/elastic/kibana/pull/199873","mergeCommit":{"message":"fix(slo):
Use correct calendar period
(#199873)","sha":"3cbdcc3609269dcf109fe787359b2504203da229"}},"sourceBranch":"main","suggestedTargetBranches":["8.x"],"targetPullRequestStates":[{"branch":"main","label":"v9.0.0","branchLabelMappingKey":"^v9.0.0$","isSourceBranch":true,"state":"MERGED","url":"https://github.com/elastic/kibana/pull/199873","number":199873,"mergeCommit":{"message":"fix(slo):
Use correct calendar period
(#199873)","sha":"3cbdcc3609269dcf109fe787359b2504203da229"}},{"branch":"8.x","label":"v8.17.0","branchLabelMappingKey":"^v8.17.0$","isSourceBranch":false,"state":"NOT_CREATED"}]}]
BACKPORT-->

Co-authored-by: Kevin Delemme <[email protected]>
  • Loading branch information
kibanamachine and kdelemme authored Nov 13, 2024
1 parent 207e485 commit c37c6c2
Show file tree
Hide file tree
Showing 7 changed files with 1,379 additions and 1 deletion.
Loading

0 comments on commit c37c6c2

Please sign in to comment.