chore: fixed period select refactor #4754
dhis2-verify-app.yml
on: pull_request
Matrix: call-workflow-e2e-prod / e2e-prod
Annotations
4 errors
call-workflow-e2e-prod / e2e-prod (2.40, 2)
Canceling since a higher priority waiting request for 'e2e-prod-dhis2: verify (app)-refs/pull/2989/merge' exists
|
call-workflow-e2e-prod / e2e-prod (2.40, 2)
The operation was canceled.
|
call-workflow-e2e-prod / e2e-prod (2.40, 1)
Canceling since a higher priority waiting request for 'e2e-prod-dhis2: verify (app)-refs/pull/2989/merge' exists
|
call-workflow-e2e-prod / e2e-prod (2.40, 1)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
app-build
Expired
|
67.2 MB |
|