refactor: Category to ProjectTemplateCategory #8379
e2e.yml
on: pull_request
changes
3s
Matrix: build_dfx
Matrix: smoke
Matrix: ui_test
Matrix: test
e2e:required
0s
Annotations
9 errors
build_dfx (windows-2022)
Canceling since a higher priority waiting request for 'e2e-refs/pull/4015/merge' exists
|
build_dfx (windows-2022)
The operation was canceled.
|
build_dfx (ubuntu-20.04)
Canceling since a higher priority waiting request for 'e2e-refs/pull/4015/merge' exists
|
build_dfx (ubuntu-20.04)
The operation was canceled.
|
build_dfx (ubuntu-22.04)
Canceling since a higher priority waiting request for 'e2e-refs/pull/4015/merge' exists
|
build_dfx (ubuntu-22.04)
The operation was canceled.
|
build_dfx (macos-13-large)
Canceling since a higher priority waiting request for 'e2e-refs/pull/4015/merge' exists
|
build_dfx (macos-13-large)
The operation was canceled.
|
e2e:required
Process completed with exit code 1.
|