Skip to content
This repository has been archived by the owner on Sep 29, 2024. It is now read-only.

chore(deps): update base images #245

chore(deps): update base images

chore(deps): update base images #245

Triggered via push February 28, 2024 00:29
Status Failure
Total duration 10m 23s
Artifacts 8

master.yml

on: push
Matrix: ci / build-test
tag  /  tag
tag / tag
Fit to window
Zoom out
Zoom in

Annotations

4 errors
ci / build-test (fedora-40, fedora.dockerfile)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 10 minutes.
ci / build-test (fedora-40, fedora.dockerfile)
The operation was canceled.
ci / build-test (ubuntu-23.10, debian.dockerfile)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 10 minutes.
ci / build-test (ubuntu-23.10, debian.dockerfile)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
archlinux-screenshots Expired
26 KB
centos-9-screenshots Expired
28.1 KB
debian-12-screenshots Expired
27.5 KB
fedora-38-screenshots Expired
26.6 KB
fedora-39-screenshots Expired
25 KB
opensuse-leap-15.5-screenshots Expired
25.4 KB
opensuse-tumbleweed-screenshots Expired
25.3 KB
ubuntu-22.04-screenshots Expired
26 KB