feat(integration/dagster): dagster connector to emit dagster pipeline #6
Triggered via pull request
September 6, 2023 11:13
Status
Cancelled
Total duration
1h 45m 57s
Artifacts
2
dagster-plugin.yml
on: pull_request
event-file
2s
Matrix: dasgter-plugin
Annotations
7 errors and 1 warning
dasgter-plugin (3.10, dagster>=1.3.3)
Process completed with exit code 1.
|
dasgter-plugin (3.10, dagster>=1.3.3)
Process completed with exit code 1.
|
dasgter-plugin (3.7, dagster>=1.3.3)
Process completed with exit code 1.
|
dasgter-plugin (3.10, dagster>=1.3.3)
Process completed with exit code 1.
|
dasgter-plugin (3.7, dagster>=1.3.3)
Canceling since a higher priority waiting request for 'Dagster Plugin-8384' exists
|
dasgter-plugin (3.7, dagster>=1.3.3)
Process completed with exit code 1.
|
dasgter-plugin (3.7, dagster>=1.3.3)
The operation was canceled.
|
dasgter-plugin (3.7, dagster>=1.3.3)
Failed to restore: The operation cannot be completed in timeout.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
Event File
Expired
|
32 KB |
|
Test Results (dasgter Plugin 3.10)
Expired
|
474 Bytes |
|