Skip to content

Daily Build (Main) #450

Daily Build (Main)

Daily Build (Main) #450

Triggered via schedule September 30, 2024 16:16
Status Failure
Total duration 45m 13s
Artifacts 12

daily-build.yml

on: schedule
Matrix: build / build
pre-actions  /  set-vars
0s
pre-actions / set-vars
pre-actions  /  export-github-context
0s
pre-actions / export-github-context
pre-actions  /  export-metadata
4s
pre-actions / export-metadata
post-actions  /  report-workflow-run
0s
post-actions / report-workflow-run
Matrix: pre-actions / instantiate-check-runs
pre-actions  /  notify-build-start
0s
pre-actions / notify-build-start
Fit to window
Zoom out
Zoom in

Annotations

1 error
build / build (linux, mipsle)
The hosted runner: GitHub Actions 12 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.

Artifacts

Produced during runtime
Name Size
dae-linux-arm64
12.7 MB
dae-linux-armv5
12.8 MB
dae-linux-armv6
12.8 MB
dae-linux-armv7
12.7 MB
dae-linux-mips32
12.3 MB
dae-linux-mips64
12.1 MB
dae-linux-mips64le
12 MB
dae-linux-riscv64
12.8 MB
dae-linux-x86_32
12.9 MB
dae-linux-x86_64
13.4 MB
dae-linux-x86_64_v2_sse
13.4 MB
dae-linux-x86_64_v3_avx2
13.4 MB