Skip to content

Limit verbose log line on scheduled migration cancellation #12

Limit verbose log line on scheduled migration cancellation

Limit verbose log line on scheduled migration cancellation #12

Triggered via push December 4, 2024 03:14
Status Failure
Total duration 1m 49s
Artifacts
Get-CI-Image-Tag  /  Get-CI-Image-Tag
4s
Get-CI-Image-Tag / Get-CI-Image-Tag
Matrix: Build and test Alerting
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 3 warnings
Build and test Alerting (23)
The job was canceled because "_21" failed.
Build and test Alerting (23)
The operation was canceled.
Get-CI-Image-Tag / Get-CI-Image-Tag
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Build and test Alerting (21)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Build and test Alerting (23)
Docker pull failed with exit code 1, back off 9.897 seconds before retry.