Use uv #1396
ci.yaml
on: pull_request
test
/
matrix-prep-os
0s
test
/
matrix-prep-bazelversion
2s
verify-bcr-patches
2s
Matrix: test / test
Annotations
10 errors
verify-bcr-patches
Process completed with exit code 1.
|
test / test (ubuntu-latest, 6.4.0, e2e/repository-rule-deps, true)
Process completed with exit code 1.
|
test / test (ubuntu-latest, 7.1.0, e2e/smoke, true)
Process completed with exit code 1.
|
test / test (ubuntu-latest, 7.1.0, e2e/repository-rule-deps, true)
Process completed with exit code 1.
|
test / test (ubuntu-latest, 6.4.0, e2e/smoke, true)
Process completed with exit code 1.
|
test / test (ubuntu-latest, 7.1.0, examples/uv_pip_compile, true)
Process completed with exit code 1.
|
test / test (ubuntu-latest, 7.1.0, e2e/system-interpreter, true)
Process completed with exit code 1.
|
test / test (ubuntu-latest, 6.4.0, e2e/system-interpreter, true)
Process completed with exit code 1.
|
test / test (ubuntu-latest, 7.1.0, ., false)
Canceling since a higher priority waiting request for 'concurrency-group::CI::pr-415' exists
|
test / test (ubuntu-latest, 7.1.0, ., false)
The operation was canceled.
|