Skip to content

chore(deps): update dependency goreleaser/goreleaser to v2.4.8 #6437

chore(deps): update dependency goreleaser/goreleaser to v2.4.8

chore(deps): update dependency goreleaser/goreleaser to v2.4.8 #6437

Triggered via pull request November 22, 2024 18:24
Status Cancelled
Total duration 2m 1s
Artifacts

test.yaml

on: pull_request
Matrix: integration-test / integration-test-all-envs
path-filter
3s
path-filter
integration-test  /  integration-test
35s
integration-test / integration-test
integration-test  /  integration-test-cargo
33s
integration-test / integration-test-cargo
update-aqua-checksums  /  ...  /  update-aqua-checksums
16s
update-aqua-checksums / update-aqua-checksums / update-aqua-checksums
test  /  test
0s
test / test
ghalint  /  ghalint
ghalint / ghalint
go-mod-tidy  /  ...  /  go-mod-tidy
go-mod-tidy / go-mod-tidy / go-mod-tidy
renovate-config-validator  /  ...  /  renovate-config-validator
renovate-config-validator / renovate-config-validator / renovate-config-validator
test-docker-prebuilt  /  test-docker
test-docker-prebuilt / test-docker
status-check  /  status-check
status-check / status-check
enable-automerge  /  enable-auto-merge
enable-automerge / enable-auto-merge
Fit to window
Zoom out
Zoom in

Annotations

15 errors
integration-test / integration-test-all-envs (macos-13)
Process completed with exit code 1.
update-aqua-checksums / update-aqua-checksums / update-aqua-checksums: aqua/aqua-checksums.json#L1
aqua/aqua-checksums.json isn't latest. A commit is pushed automatically to update aqua/aqua-checksums.json.
update-aqua-checksums / update-aqua-checksums / update-aqua-checksums
Process completed with exit code 1.
integration-test / integration-test-all-envs (macos-14)
The job was canceled because "macos-13" failed.
integration-test / integration-test-all-envs (macos-14)
The operation was canceled.
integration-test / integration-test-all-envs (windows-latest)
The job was canceled because "macos-13" failed.
integration-test / integration-test-all-envs (windows-latest)
The operation was canceled.
integration-test / integration-test-cargo
Canceling since a higher priority waiting request for 'test-refs/pull/3278/merge' exists
integration-test / integration-test-cargo
The operation was canceled.
integration-test / integration-test-all-envs (ubuntu-24.04)
The job was canceled because "macos-13" failed.
integration-test / integration-test-all-envs (ubuntu-24.04)
The operation was canceled.
integration-test / integration-test
Canceling since a higher priority waiting request for 'test-refs/pull/3278/merge' exists
integration-test / integration-test
The operation was canceled.
test / test
Canceling since a higher priority waiting request for 'test-refs/pull/3278/merge' exists
test / test
The operation was canceled.