Skip to content

Update dependency pyarrow to v18.1.0 #1978

Update dependency pyarrow to v18.1.0

Update dependency pyarrow to v18.1.0 #1978

Triggered via push November 26, 2024 04:46
Status Failure
Total duration 2m 58s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.10)
Process completed with exit code 1.
test (3.9)
Process completed with exit code 1.
test (3.12)
The job was canceled because "_3_10" failed.
test (3.12)
Process completed with exit code 1.
test (3.11)
The job was canceled because "_3_10" failed.
test (3.11)
The operation was canceled.