Skip to content

Commit

Permalink
Update 013-2024-02-13.md
Browse files Browse the repository at this point in the history
Signed-off-by: Drinkwater <[email protected]>
  • Loading branch information
brewsterdrinkwater authored Feb 13, 2024
1 parent aadf68c commit c164bca
Showing 1 changed file with 8 additions and 1 deletion.
9 changes: 8 additions & 1 deletion sig-chain/meetings/013-2024-02-13.md
Original file line number Diff line number Diff line change
Expand Up @@ -21,7 +21,14 @@

## Notes


- Tyler mentioned that the core team is working on a number of items.
- Artur reitterated that there are 3 upgrades planned for the quarter. The work for network upgrade has been deplayed.
- Artur has implemented changes for expedited proposals.
- Artur mentioned that CosmosSDK 50.0 is very useable. Going to plan to get there quite soon, and want to upgrade potentially end of q2.
- These are quite drastic changes so this will be added to the roadmap some time soon.
- After expedited govenernance proposals, closing status of the lease, is the next planned upgrade. Network upgrade will allow users to see why lease was closed.
- This second proposal
- ICA is also on the table. Packet forwarding is more important. This is the 3rd governance proposal.

### Action Items

Expand Down

0 comments on commit c164bca

Please sign in to comment.