Skip to content

refactor the code

refactor the code #39

Triggered via push October 15, 2023 02:06
Status Failure
Total duration 57s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.8)
Process completed with exit code 16.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
Process completed with exit code 16.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
The operation was canceled.