Skip to content

refactor: WIP

refactor: WIP #2628

Triggered via push November 6, 2024 17:11
Status Failure
Total duration 1m 54s
Artifacts

tests.yaml

on: push
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Test (macos)
Process completed with exit code 101.
Test (nightly)
The job was canceled because "macos" failed.
Test (win-msvc)
The job was canceled because "macos" failed.
Test (win-msvc)
The operation was canceled.
Test (msrv)
The job was canceled because "macos" failed.
Test (msrv)
The operation was canceled.
Test (protoc)
The job was canceled because "macos" failed.
Test (protoc)
The operation was canceled.
Test (stable)
The job was canceled because "macos" failed.
Test (stable)
The operation was canceled.
Test (no-default-features)
The job was canceled because "macos" failed.
Test (no-default-features)
The operation was canceled.