Skip to content

Snapsync with p2p #9626

Snapsync with p2p

Snapsync with p2p #9626

Triggered via pull request October 25, 2024 07:56
Status Cancelled
Total duration 4m 18s
Billable time 5m
Artifacts

juno-test.yml

on: pull_request
Matrix: Run Tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Run Tests (ubuntu-latest)
Canceling since a higher priority waiting request for 'Juno Test-refs/pull/2120/merge' exists
Run Tests (ubuntu-latest)
The operation was canceled.
Run Tests (ubuntu-arm64-4-core)
Canceling since a higher priority waiting request for 'Juno Test-refs/pull/2120/merge' exists
Run Tests (ubuntu-arm64-4-core)
The operation was canceled.
Run Tests (macos-latest)
Canceling since a higher priority waiting request for 'Juno Test-refs/pull/2120/merge' exists
Run Tests (macos-latest)
The operation was canceled.