Implementing the Build + Test -> Build + Push workflow steps #79
Annotations
5 errors
docker-build-and-push-images (ghcr.io/everest/everest-demo, mqtt-server, ./mosquitto)
Process completed with exit code 2.
|
docker-build-and-push-images (ghcr.io/everest/everest-demo, manager, ./manager)
The job was canceled because "ghcr_io_everest_everest_2" failed.
|
docker-build-and-push-images (ghcr.io/everest/everest-demo, manager, ./manager)
The operation was canceled.
|
docker-build-and-push-images (ghcr.io/everest/everest-demo, nodered, ./nodered)
The job was canceled because "ghcr_io_everest_everest_2" failed.
|
docker-build-and-push-images (ghcr.io/everest/everest-demo, nodered, ./nodered)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
MukuFlash03~everest-demo~O1K5FB.dockerbuild
|
19.4 KB |
|
MukuFlash03~everest-demo~TYPIXE.dockerbuild
|
29.1 KB |
|