TBD
Empirical study of impact of inter-test dependency on test parallization
Experiment 1 : Follow these steps -
-
Put the collections of projects inside a folder named
projects
and put this folder (projects
) inside Experiment1/ folder. -
Run the
./experiment_1.sh
inside Experiment1 folder. -
If the
projects
folder contains a lot of projects it can be splitted into five batches. Run./create_batch.sh projects
. This will create five batches in the same directory as the script --BATCH-1
,BATCH-2
,BATCH-3
,BATCH-4
,BATCH-5
. Place the contents of each batch one by one inside theprojects
folder and run the experiment by./experiment_1.sh
-
The logs of the experiment will be placed inside
LOG
folder. The summary of the experiment will be appended incrementally in theSUMMARY.csv
file inside theLOG
folder.