Extensions and bug fixes #28
ci.yml
on: push
tc-llvm
6m 46s
tc-isa-sim
2m 43s
tc-verilator
23s
tc-gcc
3m 41s
check-license
30s
check-trailing-whitespaces
5s
Matrix: compile-apps
check-clang-format
1m 43s
Matrix: compile-ara
Matrix: compile-riscv-tests
Matrix: simulate
Matrix: benchmark
Matrix: riscv-tests-simv
Annotations
14 errors
check-trailing-whitespaces
Process completed with exit code 2.
|
compile-ara (4_lanes)
Process completed with exit code 1.
|
compile-ara (8_lanes)
Process completed with exit code 1.
|
compile-ara (2_lanes)
Process completed with exit code 1.
|
compile-ara (16_lanes)
Process completed with exit code 1.
|
compile-apps (8_lanes)
Process completed with exit code 2.
|
compile-apps (16_lanes)
The job was canceled because "_8_lanes" failed.
|
compile-apps (16_lanes)
The operation was canceled.
|
compile-apps (4_lanes)
The job was canceled because "_8_lanes" failed.
|
compile-apps (4_lanes)
The operation was canceled.
|
compile-apps (2_lanes)
The job was canceled because "_8_lanes" failed.
|
compile-apps (2_lanes)
The operation was canceled.
|
check-clang-format
Process completed with exit code 1.
|
riscv-tests-spike
Process completed with exit code 2.
|