- Well_id is the unique identifier of the well.
- Reservoir pressure — fluid pressure in the reservoir, [pressure].
- ISIP (Instantaneous Shut-In Pressure— - fluid pressure after mini-hydraulic fracturing 5, [pressure].
- Closure Pressure — liquid pressure when the crack is completely closed, [pressure].
- PAD Volume — the volume of pure liquid injected into the crack, [volume].
- Fluid Efficiency — the efficiency of hydraulic fracturing fluid (calculated as the ratio of the crack volume to the volume of the injected fluid), [0-1].
- Transmissibility (throughput) — coefficient, characterizing the resistance of the liquid to flow through the formation.
- Total Prop Mass — the total mass of the injected proppant during main processing, [mass].
- Max Prop Conc — the maximum concentration of the proppant during the main treatment, [concentration].
This repository has been archived by the owner on Nov 7, 2024. It is now read-only.
-
Notifications
You must be signed in to change notification settings - Fork 0
Kotyga/Hydraulic_fracturing
Folders and files
Name | Name | Last commit message | Last commit date | |
---|---|---|---|---|
Repository files navigation
About
No description, website, or topics provided.
Resources
Stars
Watchers
Forks
Releases
No releases published
Packages 0
No packages published