Skip to content

Planned Reconstruction Algorithms

Janek Gröhl edited this page Jan 13, 2022 · 10 revisions
Algorithm name Reference Contact Person (for implementation) Status
Back-projection Xu and Wang, 2003 Janek Gröhl Done
fnumber back-projection Kalkhoran et al., 2015 François Varray Done
pDAS back-projection TODO François Varray Done
SCF back-projection Kalkhoran et al., 2015 François Varray Done
PCF back-projection Kalkhoran et al., 2015 François Varray Done
Delay Multiply and Sum Matrone et al., 2014 Kris Dreher Started
signed Delay Multiply and Sum Kirchner et al., 2018 Kris Dreher Started
FFT-based reconstruction Jaeger et al., 2007 Mengjie Shi Started
FFT-based reconstruction TODO Jenni Poimala Started
Time reversal Treeby and Cox, 2010 Ben Cox & Janek Gröhl Planned
SLSC back-projection TODO ? (Muyinatu Bell) Planned
Minimum Variance Beamforming TODO ? Backlog
Eigenspace Minimum Variance Beamforming TODO ? Backlog
SCF DMAS Jeon et al., 2019 ? Backlog
PCF DMAS TODO ? Backlog
Double-stage DMAS TODO ? Backlog
p-th root DMAS TODO ? Backlog
Clone this wiki locally