Sprint‐report‐1
Abhinav Gokari (alert-butterfly): Product Owner
Edgardo Rios (tender-pigeon): Scrum Master
Huangrui Chu (eager-boar) : Lead Developer
Xincong "Jerry" He (proud-salmon): Senior Developer
Lu Cao (puzzled-hornet): Junior Developer
Assessment of the requirements and checkpoints as stated by stakeholders
Revision of the starter pack
PO started working on the creation of user stories based on stakeholder requirements
Clarification of stories: Scrum master asked the PO to clarify some of the stories Breakdown of stories
Resource planning: Dev team established their output capacity
Estimation: Scrum master assigned story-points to the user stories created by the PO
Scrum master and Lead Dev prioritized stories
Acceptance criteria: PO and Scrum master agreed on acceptance criteria
Documentation: Documentation of completed tasks
Product demonstration: Dev team presents to the PO the progress made on the product.
Dev team presets the basic structure of the "evenbrite" site: The site has HTML structure (footers and headers are present), an initial list of events is set, the site is lodged under a "withered-horizon" URL and events have basic input boxes. Reviewed sprint goals : project is ahead of schedule
Determined backlog refinements:
a) Urgent: Site needs to show the emails of people that RSVP to the event
b) High: Site should control for "bad images" (wrong format etc)
c) Low: Add option to donate to an event (maybe via QR code).