Skip to content

Run butane-core tests with async-adapter feature (#281) #678

Run butane-core tests with async-adapter feature (#281)

Run butane-core tests with async-adapter feature (#281) #678

Triggered via push November 21, 2024 17:56
Status Failure
Total duration 2m 54s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 2 warnings
build (ubuntu-latest)
Process completed with exit code 101.
build (macos-12)
The job was canceled because "ubuntu-latest" failed.
build (windows-2019)
The job was canceled because "ubuntu-latest" failed.
build (windows-2019)
The operation was canceled.
build (ubuntu-latest): butane_core/src/migrations/fsmigrations.rs#L509
a method with this name may be added to the standard library in the future
build (ubuntu-latest): butane_core/src/migrations/fsmigrations.rs#L524
a method with this name may be added to the standard library in the future