Skip to content

Unify gnu and musl

Unify gnu and musl #60

Triggered via push November 14, 2024 14:38
Status Cancelled
Total duration 7m 57s
Artifacts

build-ruby.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

31 errors
Build (ruby 3.3 musl)
Process completed with exit code 5.
Build (ruby 3.1 musl)
Process completed with exit code 5.
Build (ruby 3.2 musl)
Process completed with exit code 5.
Build (ruby 3.0 musl)
Process completed with exit code 5.
Build (ruby 3.4 musl)
Process completed with exit code 5.
Build (ruby 3.2 gnu)
The run was canceled by @lloeki.
Build (ruby 3.2 gnu)
The operation was canceled.
Build (jruby 9.2 gnu)
The run was canceled by @lloeki.
Build (jruby 9.2 gnu)
The operation was canceled.
Build (ruby 2.2 gnu)
The run was canceled by @lloeki.
Build (ruby 2.2 gnu)
The operation was canceled.
Build (jruby 9.2 musl)
The run was canceled by @lloeki.
Build (jruby 9.2 musl)
The operation was canceled.
Build (ruby 3.3 gnu)
The run was canceled by @lloeki.
Build (ruby 3.3 gnu)
The operation was canceled.
Build (ruby 2.6 musl)
The run was canceled by @lloeki.
Build (ruby 2.6 musl)
The operation was canceled.
Build (ruby 2.1 gnu)
The run was canceled by @lloeki.
Build (ruby 2.1 gnu)
The operation was canceled.
Build (jruby 9.3 gnu)
The run was canceled by @lloeki.
Build (jruby 9.3 gnu)
The operation was canceled.
Build (jruby 9.3 musl)
The run was canceled by @lloeki.
Build (jruby 9.3 musl)
The operation was canceled.
Build (jruby 9.4 musl)
The run was canceled by @lloeki.
Build (jruby 9.4 musl)
The operation was canceled.
Build (ruby 2.7 musl)
The run was canceled by @lloeki.
Build (ruby 2.7 musl)
The operation was canceled.
Build (jruby 9.4 gnu)
The run was canceled by @lloeki.
Build (jruby 9.4 gnu)
The operation was canceled.
Build (ruby 3.4 gnu)
The run was canceled by @lloeki.
Build (ruby 3.4 gnu)
The operation was canceled.