This iteration is intended to create the Beta version of the product - which means that the product is done and is now entering the public testing phase.
- Add notification support when adding a story or by demand
- Add Facebook API integration to the gallery
- Fill the information tab with the needed information
- Add a rich text editor for the admin panel input methods
- Add a floating dropbox button for the organization dropbox
- Design native application icons
The areas in the product are distributed as follows:
- Eliyah Weinberg will be responsible for iOS testing
- Odelia Ivginehaz will be responsible for the information page and all its inner tabs
- Chanan Merari will be responsible for the home page and the admin panel
- Daniel Lifshitz will be responsible for the gallery page and its integration with Facebook API
- Lior Vaknin will be responsible for all server side code and general ionic infrastructure, including notifications support
The project tasks and their matching iterations and priority can be found in the issues page The current iteration issues can be found here and here
The main project Kanban board can be found here
The iteration estimation is set in the milestone
The product at this point includes all the features for the final product:
- All the features from the previous iteration
- Notifications by demand
- Rich text editor in the admin panel
- Facebook API integration for photos
- Relevant information in the information tab
The product can be seen in our live deployment
The organization was very satisfied with the Beta version of the product and the publication to the app stores of the platforms was discussed and approved to be within a week of the meeting. Some minor fixes were brought up for the final Beta version:
- Add a notification push for each event that is added to the application
- Update the FAQ page with relevant information
- Update relevant information in the departments page
- Finish the mail link for all department pages
After minor setbacks in the previous iteration, all the tasks were done in time and the product is now back on the scheduled track. the Beta version is now ready for the testing period which will be the 4'th iteration. The iteration went smoothly and no faults were encountered during the development period.
Code review is shared across team members both verbally and on each issue (if needed), any remark that was made during the iteration on the quality of the code can be tracked in the iteration issues