Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

optimism deployment #1

Merged
merged 8 commits into from
Nov 27, 2024
Merged

optimism deployment #1

merged 8 commits into from
Nov 27, 2024

Conversation

technophile-04
Copy link
Member

Description:

  • Fix final approval UI UX (#92)
  • Fix grants order bug (#95)
  • Remove withdrawals table (#93)
  • fix: withdrawals bar overflow (#100)
  • feat: withdrawals migration (#101)
  • Ponder env (#102)
  • optimism deployment

rin-st and others added 7 commits November 25, 2024 15:44
* update contract with multiple owner

* remove this later: add sepolia contract to frontend

* configure ponder

* add apollo client

* update sepolia deployment + fetching with apollo client

* remove singature while withdrawal + featch / update data from ponder

* add comments

* update readme

* udpate .env.development

* use vercel/postgres driver

* complete stage via ponder + handle edge case in new stage if ponder fails

* fix date in milestone modal

* update test + revert contract unlock period to 30 days

* Update packages/nextjs/app/_components/ApprovedGrants/GrantMilestonesModal.tsx

Co-authored-by: Pablo Alayeto <[email protected]>

* use targetNetwork instead of hardcoded sepolia id and chain

* Add initial ENS content and small tweaks (#71)

* remove address assertion in ApprovedGrantItem

* if env is prod use url from env

* add comment for env

* update my-grants route to parse bigint

* update all 3 get api routes to parse bigint

* Tweak workflow description

* All grants page with filters for admins (#72)

* Approval votes (#77)

* Update footer and other minor tweaks (#79)

Co-authored-by: Rinat <[email protected]>

* fix gratNumber mismatch (#81)

* Required tg tw fields (#88)

* Thumbnail and user feedback messages (#91)

* chore: preconfigure hardhat

* fix: grants order bug

* fix: update tests

* chore: eof

* fix existingBuilderGrants coversion in contract

* chore: remove log

---------

Co-authored-by: Shiv Bhonde <[email protected]>
Co-authored-by: pabl0cks <[email protected]>
Co-authored-by: Pablo Alayeto <[email protected]>
Co-authored-by: Shiv Bhonde <[email protected]>
Co-authored-by: pabl0cks <[email protected]>
Co-authored-by: Pablo Alayeto <[email protected]>
Copy link

vercel bot commented Nov 27, 2024

The latest updates on your projects. Learn more about Vercel for Git ↗︎

Name Status Preview Comments Updated (UTC)
ens-pg ✅ Ready (Inspect) Visit Preview 💬 Add feedback Nov 27, 2024 5:33pm

@technophile-04 technophile-04 merged commit 742f3bd into main Nov 27, 2024
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants