Skip to content

chore: transform contracts repository into forge repository and fix the ERC20 bytecode deployment issue #106

chore: transform contracts repository into forge repository and fix the ERC20 bytecode deployment issue

chore: transform contracts repository into forge repository and fix the ERC20 bytecode deployment issue #106

Triggered via pull request November 20, 2023 15:15
Status Failure
Total duration 10m 29s
Artifacts

ci.yml

on: pull_request
Matrix: Loadtest against geth
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 1 warning
Loadtest against geth (geth)
Process completed with exit code 100.
Loadtest against geth (anvil)
The job was canceled because "geth" failed.
Loadtest against geth (anvil)
The operation was canceled.
Smart contracts
Process completed with exit code 1.
Smart contracts
Failed to restore: The operation cannot be completed in timeout.