get datums using pallas observer #15
ci.yml
on: pull_request
Matrix: test
Matrix: build
check
1m 15s
build-test-wasm
1m 4s
build-ubuntu-X64
1m 42s
Matrix: deploy-testing
Annotations
10 errors
check
Process completed with exit code 1.
|
test (windows-latest)
The operation was canceled.
|
build (windows-latest)
The operation was canceled.
|
build-ubuntu-X64
The operation was canceled.
|
publish-wasm-test (mithril-client-wasm)
The operation was canceled.
|
test (macos-12)
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/1/merge' exists
|
test (macos-12)
The operation was canceled.
|
build (macos-12)
The operation was canceled.
|
test (ubuntu-22.04)
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/1/merge' exists
|
test (ubuntu-22.04)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
mithril-distribution-wasm
Expired
|
536 KB |
|