Annual, company-wide, event over several days
- DiRT: Disaster Recovery Training (or "Game Day")
- Expensive to run
- Has caused actual outages leading to revenue loss
Given that every team is ready and on-site, problems can be resolved quickly
Game Day complements continuous component testing.
Example: A data centre is partitioned by failure of a switch
- Recovery requires both DNS and directory services to failover (switch to backups)
- The individual failovers should be tested regularly
- Game Day tests whether all the individual failovers work together
Caused Failure of Bay Area Google data center
- Housed a number of internal services
- Some of those services could not recover (single home, single point of failure)
- Other services failed over to their local workstations
- These didn't work either
- Internal authentication services failed
- Most Google staff now couldn't work
- Everyone went to dinner
- Local cafes Denial-of-Service'd
- System for redirecting pages and alerts to non-Bay Area offices also failed
- Calls reporting errors were not received
- Accounting approvals-tracking did failover
- But the people who could approve the new topology were themselves cut off
- So the automatically reconfigured system was useless
Failures of multiple systems in parallel
- Loss of a data centre
- Backbone fiber cable cut
- Failure of core infrastructure on which other systems depend (Colossus file system, authentication, ...)
Identify weaknesses in less-tested interfaces between systems and groups
- Design by team with members from all affected groups
- Multiple teams collaborate to resolve problem
- Important to have them all there and ready
Be ready to turn off the test if serious problems arise
Technical team
- Design cross-service tests
- Evaluate tests by individual teams
- Cause large-scale outages
- Monitors test progress
- Manages recovery when things go "worng"
Coordinators
- Plan and schedule tests
- Ensure preparation done
First test: Only one person figured out how to connect
Second test: 100 people connected ... but bridge only held 40 connections
Third test: A caller put the bridge on hold ... no one else could call in or out
Simulated long-term power outage for a data center
Needed to buy extra diesel fuel for backup generator ($$$)
No authorization possible from central management (comm failure)
Expected employees to use (documented) emergency spending procedure
Instead: Charged > $100,000 on personal credit card
One data centre goes down abruptly (Atlanta)
The zombies are fiction (... maybe?) but the shutdown is real
- Other three centres take up slack
- Performance SLA maintained
- But resilience SLA requires running with only two data centres
- So they cleanly shut down another (Europe)
- Now barely within performance SLA
Start off with a few volunteer teams
First tests can be quite safe
Don't expect a team's first tests to really test much
Increase complexity and breadth of tests with each run
Embrace failure as a means of learning
Track every problem
Solid champion amongst senior executives aids process (VP Operations at Google)
Read {{site.data.bibliography.hoff2007.title}}.
Key points:
- Why logging everything is necessary
- Why you need to build logging in rather than bolt it on later
- Why it needs to be fast
The post ends with a long list of bullet points for logging design. Each entry is terse and there are many. Get a general gist of these guidelines but don't expect to memorize every one.