Bump twig/twig from 3.7.0 to 3.7.1 in /support/devcenter #2
ci.yml
on: pull_request
Matrix: integration-test
post-integration-test
26s
Annotations
4 errors
integration-test (heroku-22)
Process completed with exit code 1.
|
integration-test (heroku-20)
The job was canceled because "heroku-22" failed.
|
integration-test (heroku-20)
The operation was canceled.
|
post-integration-test
Process completed with exit code 1.
|