You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I have deployed the personal calendar webpart in a SharePoint site, but I have problem when displaying the events, it shows three hours earlier. It should display the event timing same as in the calendar.
For example, if the meeting in the Calander is at 9:00am, the webpart displays it at 12: pm.
I have installed the packages without changing anything in the code.
Steps to Reproduce
install react-personal-calendar.sppkg to AppCatalog
Install library-starter-kit-shared.sppkg and mgt-spfx-v2.9.0.sppkg
Category
Describe the bug
I have deployed the personal calendar webpart in a SharePoint site, but I have problem when displaying the events, it shows three hours earlier. It should display the event timing same as in the calendar.
For example, if the meeting in the Calander is at 9:00am, the webpart displays it at 12: pm.
I have installed the packages without changing anything in the code.
Steps to Reproduce
Environment Details (Development & Target environment)
The text was updated successfully, but these errors were encountered: