Skip to content

System Reset Before Migration

Brian Presley edited this page Aug 3, 2024 · 12 revisions

The following steps outline out to reset resources with Migration Assistant before executing the actual migration. At this point all verifications are expected to have been completed.

Proxy Reset to Passthrough Mode

Replayer Stoppage

Kafka Reset

Target Cluster Reset

Clone this wiki locally