🕊️ Migration PPOv2
-> PPO
#5428
tests.yml
on: pull_request
Matrix: check_code_quality
tests_no_optional_dep
57m 54s
Matrix: tests
Annotations
12 errors and 1 warning
tests (3.9, windows-latest)
Process completed with exit code 1.
|
tests (3.10, windows-latest)
The job was canceled because "_3_9_windows-latest" failed.
|
tests (3.10, windows-latest)
The operation was canceled.
|
tests (3.11, windows-latest)
The job was canceled because "_3_9_windows-latest" failed.
|
tests (3.11, windows-latest)
The operation was canceled.
|
tests (3.9, ubuntu-latest)
The job was canceled because "_3_9_windows-latest" failed.
|
tests (3.9, ubuntu-latest)
The operation was canceled.
|
tests (3.11, ubuntu-latest)
The job was canceled because "_3_9_windows-latest" failed.
|
tests (3.11, ubuntu-latest)
The operation was canceled.
|
tests (3.10, ubuntu-latest)
The job was canceled because "_3_9_windows-latest" failed.
|
tests (3.10, ubuntu-latest)
The operation was canceled.
|
tests_no_optional_dep
The hosted runner: GitHub Actions 254 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
tests_no_optional_dep
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 48 MB
|