Skip to content

Latest commit

 

History

History
35 lines (32 loc) · 1.7 KB

RELEASE_CHECKLIST.md

File metadata and controls

35 lines (32 loc) · 1.7 KB

Point Release checklist

THings to do before pushing a new commit to master:

  • Create new rc branch off development.
  • Update crate version numbers
  • Check that all tests pass in development (cargo test, cargo test --release)
  • Publish new crates to crates.io (./scripts/publish_crates.sh)
    • Fix any issues with publishing
  • Rebase onto master (from rc branch, git reset --soft master and git commit)
  • Tag commit
  • Write release notes on GitHub.
  • Merge back into development (where appropriate)
  • Delete branch
Crate Version Last change
infrastructure/derive 0.0.10 7d734a2e79bfe2dd5d4ae00a2b760614d21e69c4
infrastructure/shutdown 0.2.3
infrastructure/storage 0.2.1 68a59fd9a54201b2955f8a8924a63c6b402d9df3
infrastructure/test_utils 0.2.1 26951ddbada794d637c740a8ea4f84057ccdc7a2
base_layer/core 0.2.5
base_layer/key_manager 0.2.1 68a59fd9a54201b2955f8a8924a63c6b402d9df3
base_layer/mmr 0.2.1 68a59fd9a54201b2955f8a8924a63c6b402d9df3
base_layer/p2p 0.2.3
base_layer/service_framework 0.2.3
base_layer/wallet 0.2.5
base_layer/wallet_ffi 0.16.3
common 0.2.5
comms 0.2.5
comms/dht 0.2.5
applications/tari_base_node 0.5.4
applications/tari_app_grpc 0.5.2
applications/tari_console_wallet 0.5.0
applications/tari_merge_mining_proxy 0.5.4