Skip to content

Latest commit

 

History

History
45 lines (29 loc) · 3.07 KB

Uptime_Rollback_ Strategies.md

File metadata and controls

45 lines (29 loc) · 3.07 KB

Ensuring a high level of uptime during the migration from on-premises VM-based applications to managed Kubernetes on Azure requires careful planning and the implementation of specific strategies. Here are some key strategies to follow:

Perform a Thorough Assessment:

Conduct a comprehensive assessment of the current on-premises environment and application to identify potential risks and areas of impact. Analyze the dependencies, interconnections, and critical components of the application to prioritize migration tasks and minimize downtime.

Design a Redundant Architecture:

Plan and design the Kubernetes environment on Azure with high availability in mind. Utilize Azure Availability Zones or regionally redundant configurations to ensure resiliency against infrastructure failures. Use multiple replicas of critical services and implement load balancing to distribute traffic evenly across the replicas.

Set Up Parallel Environments:

Create parallel environments where both the on-premises and Azure Kubernetes environments coexist during the migration process. Use DNS or load balancer configurations to gradually shift traffic from the on-premises environment to the Azure environment. This allows for a phased migration and minimizes the impact on end-users.

Implement Rolling Updates and Blue-Green Deployments:

Use rolling updates to minimize downtime during application updates or configuration changes in the Kubernetes environment. Deploy new versions of containers or Helm releases incrementally, updating one replica or pod at a time while maintaining service availability. Blue-green deployments involve deploying a new version of the application alongside the existing version, then gradually shifting traffic to the new version while monitoring for any issues.

Conduct Rigorous Testing:

Thoroughly test the application in the Azure Kubernetes environment before migrating production workloads. Conduct performance testing, load testing, and failover testing to ensure the environment can handle the expected workload and failover scenarios without significant downtime.

Implement Monitoring and Alerting:

Set up comprehensive monitoring and alerting systems to continuously monitor the health and performance of the Kubernetes cluster, applications, and infrastructure components. Monitor key metrics such as resource utilization, response times, and error rates. Establish alerts to notify the operations team of any abnormal behavior or performance degradation.

Have a Rollback Plan:

Despite thorough testing, it's important to have a rollback plan in case any issues or unexpected problems arise during the migration. Document the steps to revert back to the on-premises environment if necessary and ensure the team is familiar with the rollback process.

Communicate and Coordinate:

Maintain open communication channels with stakeholders, end-users, and the migration team to manage expectations and provide regular updates throughout the migration process. Coordinate with different teams, such as development, operations, and networking, to ensure a smooth and well-coordinated migration.