You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
If a job is removed or just renamed (id changes) and the last build failed, the fail phase goes on indefinitely as that job is never turned back into green.
Possible solution:
Fuzzy logic by which a certain interval without new builds means the job has been decommissioned.
The text was updated successfully, but these errors were encountered:
If a job is removed or just renamed (id changes) and the last build failed, the fail phase goes on indefinitely as that job is never turned back into green.
Possible solution:
Fuzzy logic by which a certain interval without new builds means the job has been decommissioned.
The text was updated successfully, but these errors were encountered: