In this section, we will address some good practices related to KANBAN.
- KANBAN definition
- Core Properties
- KANBAN Board
- Iterations
- Planning
- Optimization and improvement
- Good practices for KANBAN teams
- References
Wikipedia's definition for KANBAN is:
KANBAN is a method for managing knowledge work with an emphasis on just-in-time delivery while not overloading the team members. In this approach, the process, from definition of a task to its delivery to the customer, is displayed for participants to see. Team members pull work from a queue.
KANBAN in the context of software development can mean a visual process-management system that tells what to produce, when to produce it, and how much to produce - inspired by the Toyota Production System and by Lean manufacturing.
The KANBAN word is a japanese word that means 'card'. Toyota's Production System is based on cards used for production system control. Those cards contain all information needed to make the required pieces at a given time.
There are four Core Properties on KANBAN Method:
- Visualize the work: Getting all work visible allows a better management and identification of queues and bottlenecks (or personal procrastination on specific tasks).
- Limit Work In Progress (WIP): Increase focus and set priorities, manage overload (keeping an adequate margin). A proper load of Work In Progress will keep the team in the flow instead of facing anxiety or boredom.
- Measure and optimize the workflow: Try to constantly analyze the flow to increase productivity and improve the flow's smoothness.
- Make the policies visible and explicit: Every team member must know the defined policies for the process.
The KANBAN board is the main tool for following the Core Properties of KANBAN. It reflects the status for a task or story's workflow, from the moment of its creation until it is completed and delivered.
A KANBAN board can be a physical board or a collaborative digital board. But in any of them, the good practices to follow are the same:
- Keep the KANBAN board updated: The board must represent the actual state of the work.
- Keep the acquired policies visible: The board is good place to show everyone what the committed policies are.
- Keep the WIP limit visible: Each column should reflect its WIP limit.
- Begin with a simple board: At first project's stages it is recommended to use a board as simple as possible. For example:
To Do In Process Done
Once you know your workflow better, you can add new columns representing a more accurate workflow. For example:
To Do Plan Develop Test Deploy Done In progress / Done
-
Bottlenecks: The board can also be useful to detect bottlenecks: when a task cannot advance in the workflow, a potential bottleneck can be the reason. In that case, it is important to find improvements for the workflow that could clear the bottlenecks.
-
Ready Indicators: In addition to the visual workflow you can use Indicators to visualize when a task can change to the next state on the workflow.
-
Blocked Indicators: These indicators can help to visualize blocked tasks, than can not be completed or advance through the workflow.
-
Classes of service: Depending on the tasks' nature, different class of service can be defined. It is completely different to resolve a bug than building a new functionality. Each team must define its own classes of service, but a generic guideline can be followed :
- Expedite: Very important task that can not wait to be done.
- Fixed delivery date: A task that must be delivered at a fixed time.
- Standard class: A normal task which describes functionality and can be estimated.
- Intangible class: Tasks that can not be estimated.
-
Policies: The KANBAN board is a good place to make your policies explicit. You can consider general policies or specific ones for every class of service.
- In KANBAN there is no iterations, as there is only a single iteration, which is continuous. Therefore, backlog is fed as new tasks are needed.
- Finished work increment is planned and completed functionality is released frequently.
- Some iteration's common metrics, like burndown charts, are not available in KANBAN. Instead, there are other ones, like cycle time
- KANBAN does not include a planning meeting.
- Product's backlog must be ordered by priority and value.
- When a member of the group is idle, he should begin with the next Backlog's item.
- The backlog is continuously fed as new task are needed.
- Tasks' estimation can be performed when the task is placed in the board.
- KANBAN does not include a retrospective meeting.
- Instead, improvement and optimization is done whenever a team member detects a problem and an opportunity of improving the workflow.
- KANBAN is recommended for Cross Teams
- It is strongly recommended that KANBAN teams work as near as possible in order to enhance member communication.
- Although KANBAN does not enforce any roles, it is recommended to have, at least:
- A business or Product Owner
- A KANBAN Coach or Agile Coach
- A KANBAN team should strictly focus on the work in progress at any given time
- The team's goal is to reduce the amount of time an issue takes to move through the entire process