Skip to content

Latest commit

 

History

History
110 lines (63 loc) · 3 KB

v3-162-orbit-program-renewal-Q3-2024.md

File metadata and controls

110 lines (63 loc) · 3 KB

Proposal 162. Orbit Program Renewal - Q3 2024.


Voting link

https://vote.onaave.com/proposal/?proposalId=162


Governance forum discussion

https://governance.aave.com/t/arfc-orbit-program-renewal-q3-2024/18834


Payloads


Certora analysis


Proposal types

💰 🧾 asset transfer


Context

This proposal is the renewal of the Orbit program for recognized delegates, compensating them with GHO and ETH reimbursement of Gas costs , associated with their governance activity.


Proposal creation

Transaction: https://etherscan.io/tx/0xb4d985df697527008febdc395b2533e73e47e214508a114ec35d3bb8027ca81e

- proposalId: 162
- creator: 0x57ab7ee15ce5ecacb1ab84ee42d5a9d0d8112922
- accessLevel: 1
- ipfsHash: 0xc272f529dc38017c4880f8af0ec5fc13ca3f6c5de9be35e457ff5862fce1183c

createProposal() parameters

{
  "payloads": [ 
    { 
      "chain": "1", 
      "accessLevel": "1", 
      "payloadsController": "0xdAbad81aF85554E9ae636395611C58F7eC1aAEc5", 
      "payloadId": "170" 
    }, 
  ], 
  "votingPortal": "0x9b24C168d6A76b5459B1d47071a54962a4df36c3", 
  "ipfsHash": "0xc272f529dc38017c4880f8af0ec5fc13ca3f6c5de9be35e457ff5862fce1183c" 
}

Aave Seatbelt report

Proposal report

https://github.com/bgd-labs/seatbelt-gov-v3/blob/main/reports/proposals/162.md

Payload reports


Technical analysis

We have verified that the payload executes the following financial actions:

  • Transfer 2200 GHO (a one-off compensation worth 13 days of stream) to the provided addresses by EzR3al, StableNode, Saucy Block, Areta.

  • Create a stream of 15,000 GHO of 90 days to the provided addresses by EzR3al, StableNode, Saucy Block, Areta.

  • Transfer 2.91 ETH to ACI, 0.67 ETH to Catapulta and 0.72 ETH to TokenLogic as gas rebate.


The proposal is consistent with the description on both Snapshot and the governance forum except for the 2200 GHO compensation.


Certora validations

✅ The code on the proposal payload corresponds to the proposal specification.

✅ The proposal includes a proper tests suite, checking all necessary post-conditions.

✅ BGD reviewed the payload before the proposal was submitted.

✅ Certora reviewed the procedure followed to submit the proposal.