Test on either muonfe or rikenfe, this will need us to prove we can read from multiple instrument DAEs and do multiple concurrent independent fits etc.
Acceptance criteria
Make sure we have tickets for any requirements needed by that test, which we haven't yet covered
Make sure the above tickets get proposed in good time before the relevant test
Arrange the testing time
JL has agreed to a generic "test at some point in January with dark counts" followed by a short test at some point during startup at an as-yet unspecified time.
Go to the beamline and do the full test with beam during startup
Write up any relevant issues/feedback in further tickets
Planning
10/01/25 - 00:29:45
The text was updated successfully, but these errors were encountered:
Tom-Willemsen
changed the title
Prepare & perform test on next instrument (muons)
Prepare & perform test on next instrument (muons) [Dark counts January 2025, then test during cycle 2024/5 startup]
Nov 28, 2024
For muons – it doesn’t make sense to try out SCANS on RIKENFE until ARGUS is properly set up and running IBEX, and the IBEX migration itself ought to take priority. But for a quick 2 instrument test we could try running on MUONFE and take data on EMU and MUSR (all on IBEX now), scan a common beamline magnet and record the flux or perhaps process the spectra to get asymmetry. We’d need to agree a suitable time in start-up / calibration.
For muons I think we should have a day in the January shutdown to test that we can start/stop dark count runs across several instruments and get data back, even if it’s mostly zeros. Then we’re ready to go if there’s time in start up. The actual measurements with beam shouldn’t need more than a few hours to demonstrate it’s working. It’s a bit early to choose a time now.
Tom-Willemsen
changed the title
Prepare & perform test on next instrument (muons) [Dark counts January 2025, then test during cycle 2024/5 startup]
Test on muons [Dark counts 2025/01, then test during cycle 2024/5 startup]
Nov 28, 2024
Tom-Willemsen
changed the title
Test on muons [Dark counts 2025/01, then test during cycle 2024/5 startup]
Test on muons [Dark counts Jan 2025, then test during cycle 2024/5 startup]
Nov 28, 2024
Test on either muonfe or rikenfe, this will need us to prove we can read from multiple instrument DAEs and do multiple concurrent independent fits etc.
Acceptance criteria
Planning
10/01/25 - 00:29:45