Skip to content

Latest commit

 

History

History
101 lines (60 loc) · 2.86 KB

v3-179-ALC-funding-phase-IV.md

File metadata and controls

101 lines (60 loc) · 2.86 KB

Proposal 179. Aave Liquidity Committee Funding Pary IV.


Voting link

https://vote.onaave.com/proposal/?proposalId=179


Governance forum discussion

https://governance.aave.com/t/arfc-aave-liquidity-committee-funding-phase-iv/19188


Payloads


Certora analysis


Proposal types

💰 🧾 asset transfer


Context

This proposal funds the Aave Liquidity Committee (ALC) with 950k GHO to enhance GHO liquidity on Ethereum and Arbitrum through integrations with various protocols, sustaining liquidity pools, and driving broader adoption of GHO across decentralized finance (DeFi) ecosystems.


Proposal creation

Transaction: https://etherscan.io/tx/0xad7b5f9b4e882c89e84302b9413f9fc0126012a6465ac03cd1e6f63f6f8e29ef

- proposalId: 179
- creator: 0x57ab7ee15ce5ecacb1ab84ee42d5a9d0d8112922
- accessLevel: 1
- ipfsHash: 0x533f3e36e9407910de9501e672099ca132cf37410ac6f475f940b2c0536687aa

createProposal() parameters

{
  "payloads": [ 
    { 
      "chain": "1", 
      "accessLevel": "1", 
      "payloadsController": "0xdAbad81aF85554E9ae636395611C58F7eC1aAEc5", 
      "payloadId": "187" 
    }, 
  ], 
  "votingPortal": "0x9b24C168d6A76b5459B1d47071a54962a4df36c3", 
  "ipfsHash": "0x533f3e36e9407910de9501e672099ca132cf37410ac6f475f940b2c0536687aa" 
}

Aave Seatbelt report

Proposal report

https://github.com/bgd-labs/seatbelt-gov-v3/blob/main/reports/proposals/179.md

Payload reports


Technical analysis

We have verified that an allowance of 950k GHO has been approved from the Aave Treasury to the Aave Liquidity Committee (ALC) SAFE wallet on Ethereum (0xA1c93D2687f7014Aaf588c764E3Ce80aF016229b).


The proposal is consistent with the description on both Snapshot and the governance forum.


Certora validations

✅ The code on the proposal payload corresponds to the proposal specification.

✅ The proposal includes a proper tests suite, checking all necessary post-conditions.

✅ BGD reviewed the payload before the proposal was submitted.

✅ Certora reviewed the procedure followed to submit the proposal.