You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Comprehensive testing is required before the final release of the unified ECE with Tokenized Cart functionality. This includes creating a call for testing, setting up a staging environment, and conducting functional and regression tests to ensure stability and bug-free performance.
For background: pbIwZe-2ur-p2
Acceptance Criteria
A “Call for Testing” post is created to encourage team members and stakeholders to test the unified implementation.
A dedicated JN site is configured for testing purposes.
Functional tests verify all main features (e.g., tokenized payments, order summary display, product name handling).
Regression tests ensure no existing features are negatively impacted by the integration.
All identified issues are logged and tracked for resolution before the final release.
The text was updated successfully, but these errors were encountered:
Comprehensive testing is required before the final release of the unified ECE with Tokenized Cart functionality. This includes creating a call for testing, setting up a staging environment, and conducting functional and regression tests to ensure stability and bug-free performance.
For background: pbIwZe-2ur-p2
Acceptance Criteria
The text was updated successfully, but these errors were encountered: